July 4, 2007

It is almost complete, with the exception of a new floor, garden doors, baseboards, and crown molding. Those are gonna have to wait until the fall. Unfortunately I have been laid off for the summer. There is not much work for a school bus driver during the summer. That is Ok though. I don’t mind. I get to spend some time with my girls and have a bit of fun. Right now I am in the middle of putting a coat of paint on the walls in the dining room. Hopefully I can get that done today.

Posted by angiebellas @
4:18 pm •
Renovations •
February 16, 2007

We have the basement 85% gutted… We only left one bedroom downstairs cause my sil needs somewhere to sleep. Here are some photos of the progress thus far. I will post some more pictures later. This weekend will be full of work again, getting rid of the rest of the debris and cleaning the concrete. What a mess this was. The plumbing was the shits. The electrical is a mess. There was 4 foot by 6 inch strips of glass hidden up in the ceiling. Nice. 
This was the family room… The kitchen was to the right of this photo…
The demo has been started here….

This was the kitchen…. We found alot of abandoned mouse nests in here… that window needs to be replaced… We do have to have the concrete cored… More money… But well worth it…

This was where the shower was… They put the shower right over top of the hole they dug for the plumbing… Not even filling it in… So needless to say there was alot of mold on the drywall here… The hole is about 6 inches deep… We will be digging up the plumbing in the concrete and replacing all of it… Then putting back everything the right way…

This was the bathroom downstairs…
Now it is gone

This was the kitchen downstairs…
Now that is gone….
Posted by admin @
11:08 am •
Renovations •